Owned by PT Pertamina EP, the Matindok Gas Facility Station project in Donggi aims to achieve sweet gas production capacity of 60 MMSCFD, to be processed into LNG and distributed to PLN for power plants and other industrial needs. For this project, located at Sulawesi Tengah, our scope of work was EPC with a timeframe of 26 months.