With Rekind’s project experience as well as great teamwork with client and consortium, Geothermal Power Plant Lahendong 5&6 Project (14 units with installed capacity 832 MW) was succesfully finished earlier than targeted schedule. Additionaly, this project also reached expected performance result. Notably, several innovations were developed during this project, especially breakthrough in project management, construction methods, as well as manufactured local content optimalization (with local content level more than 35%).