The SAMUR project, owned by Petronas Chemical, had a capacity of 2,100 metric tons per day (MPTD) Ammonia, 3,500 MTPD of Urea Synth and 3,850 MTPD of Urea Granules. We were responsible for the basic and detailed engineering, procurement of tools and equipment, construction, and preparation for operations.